Design the circuit. Certify the job.
VoltPlan is electrical design and certification software for Mac and Windows. Draw the floor plan and it measures every cable route, sizes the cables and checks each circuit to BS 7671. Then the same job becomes your EIC, ready to sign and email.
Mac: coming soon- BS 7671:2018+A4:2026
- Every check shows its regulation
- 2 free certificates every month
Try a circuit check
BS 7671:2018+A4:2026- Current-carrying capacity
- Volt drop
- Earth fault loop impedance
Simplified example: 70°C thermoplastic twin & CPC clipped direct (reference method C), Type B device, no rating factors. VoltPlan itself applies rating factors, installation methods, the CPC adiabatic check and breaking capacity.
One job, from design to certificate
Most electricians design on paper or a spreadsheet, then type it all again into a certificate app. In VoltPlan it's one job file.
Design
Set the supply, add boards and circuits. VoltPlan picks the smallest cable that passes every check, and tells you which regulation each one comes from.
Plan
Draw the rooms or trace an architect's PDF. Place sockets, switches and lights, and VoltPlan routes each circuit and measures the cable.
Test
Fill in the schedule of test results across, like the paper form. Measured Zs is checked against 80% of the design maximum.
Certify
Copy the design to an EIC, add your signature and email a PDF with your logo on every page.
Floor plans that measure the cable
Stop guessing lengths. VoltPlan works out each run from the drawing and uses it for volt drop and Zs.
- Draw rooms, or trace over an architect's PDF and set its scale with two clicks
- Accessories go in at standard mounting heights, so every drop is counted
- Routes follow the wiring order, running parallel to the walls through ceiling or floor voids, and between floors
- Lighting wired 3-plate, loop-in at the switch or by junction box, with 2-way and intermediate switching
- Order lengths with wastage, totalled per cable size for the wholesaler
| Horizontal run in ceiling void | 16.8 m |
| Drops and rises to 4 sockets and the CU | 5.6 m |
| Terminations, 6 × 0.2 m | 1.2 m |
| Design length, used for volt drop and Zs | 23.6 m |
| Order length, with 10% wastage | 26.0 m |
Every circuit checked, with the regulation
Green means it complies. Anything else tells you why, and which regulation it fails.
- Rating factors for grouping, ambient temperature and thermal insulation
- Volt drop: 3% lighting and 5% other on a public supply, 6% and 8% on a private one
- Zs and disconnection times, CPC adiabatic check and breaking capacity
- Ring finals, sub-mains and several boards, with Ze carried down to each one
- Fuses to BS 88 and BS 3036, and SWA armour as the CPC
| Cct | Description | Device | Cable | Length | Vd % | Zs calc | Zs max | |
|---|---|---|---|---|---|---|---|---|
| 1 | Lights, ground floor | B6 | 1.0 | 22 m | 1.26 | 1.31 | 7.28 | Pass |
| 2 | Lights, first floor | B6 | 1.0 | 26 m | 1.49 | 1.48 | 7.28 | Pass |
| 3 | Kitchen sockets | B32 | 4.0 | 16 m | 1.84 | 0.67 | 1.37 | Pass |
| 4 | Lounge sockets | B20 | 2.5 | 20 m | 2.50 | 0.82 | 2.19 | Pass |
| 5 | Cooker | B32 | 6.0 | 18 m | 1.49 | 0.58 | 1.37 | Pass |
| 6 | Shower 8.5 kW | B40 | 10 | 14 m | 0.99 | 0.46 | 1.09 | Pass |
| 7 | EV charger | B32 | 4.0 | 32 m | 4.90 | 0.99 | 1.37 | Pass |
The certificates you issue
Laid out after the BS 7671 model forms, with your logo, company details and signature on every page. Start one straight away, with or without a design.
Electrical Installation Certificate
Schedules of inspections, circuit details and test results, filled from your design with Copy Design to EIC.
Electrical Installation Condition Report
C1, C2, C3 and FI observations from a built-in guide, linked to the schedule of inspections. The overall assessment is set for you.
Minor Works
For an addition or alteration that doesn't need a new circuit.
EV charger installation
Section 722 checks, with the IET Code of Practice risk assessment and checklist.
Solar PV
Filled from the PV design, with string Voc, Isc and insulation tests, and G98/G99.
PAT testing
Appliance register to the IET Code of Practice, pass/fail from the readings, import from your tester and printable asset labels.
Fire alarm, Grade D or F
Domestic fire detection and alarm systems, for mains-powered Grade D and battery-powered Grade F. BS 5839-6
Emergency lighting
Completion certificates and periodic inspection and testing records for emergency lighting systems. BS 5266-1
Only need certificates?VoltPlan Certificates
A separate, simpler app with just the certificate side of VoltPlan. No design tools to learn: start a job, fill in the forms, sign and send.
- EIC, EICR, Minor Works, EV charger, Solar PV, PAT, fire alarm and emergency lighting
- The same forms, observation guide and checks as VoltPlan
- Your logo, signature, photos and client list
- PDF export and email in one click
Unlimited certificates
Or £99.99 a year, 12 months for the price of 10.
Download for Windows Mac: coming soonBuilt for the Orange Book
Amendment 4 replaced the previous edition for new work on 15 October 2026. VoltPlan's cable data, Zs tables, inspection schedules and observation guide follow BS 7671:2018+A4:2026. The cable tables were checked line by line against it.
- 15 April 2026A4 published
- 15 October 2026A2 + A3 withdrawn
Your jobs stay yours
Jobs save automatically as files on your computer. Keep them in iCloud Drive, OneDrive, Dropbox or Google Drive and open them on Mac or Windows. No upload, and it works without signal.
Windows now, Mac soon
VoltPlan for Windows is available now and the Mac version is coming soon. Job files open on both, and one purchase covers both. An iPad app for testing and certificates on site is planned.
Straight to the developer
Faults and ideas go through Help, then Send Feedback, to the electrician who builds VoltPlan. You'll get a reply.
I'm building VoltPlan around the jobs we do every day. I was designing in one place, writing the certificate in another and typing the same numbers twice. As an electrician and a lecturer, I wanted one tool I'd use on my own jobs and happily put in front of my students.Eric Brooks, electrician, lecturer and the developer of VoltPlan
Questions electricians ask first
Do I have to buy the design side to do certificates?
No. VoltPlan Certificates is a separate app just for certificates: unlimited certificates for £9.99 a month or £99.99 a year. Or use the Free plan in VoltPlan for 2 certificates a month.
Do I need an internet connection or an account?
No. VoltPlan runs on your computer and saves jobs as files.
What happens to my certificates if I stop paying?
Certificates you've already issued still open, export and print. Only new certificates need a subscription.
Does it work on Mac, Windows or iPad?
VoltPlan for Windows is available now. The Mac version is coming soon, and one purchase will cover both. An iPad app for testing and certificates on site is planned.
Can I trust the results?
The calculations follow BS 7671:2018+A4:2026, and every check shows the regulation it comes from, so you can see the working. As with any tool, check each design and certificate yourself before you issue it.
Features
Design, plan, analyse, certify and cost the job. Each part works on its own, and they share one job file.
Electrical design
The calculations you'd do with the On-Site Guide and a calculator, done properly for every circuit.
- Size automatically. Set the load, device and installation method, and VoltPlan picks the smallest cable that passes every check. Turn it off to lock a size.
- Rating factors. Grouping (Ca), ambient temperature (Cg) and thermal insulation (Ci) from Appendix 4.
- Protection checks. Zs against Table 41.3, disconnection times, RCD fault protection, CPC adiabatic and breaking capacity.
- Boards and rings. Ring finals, sub-mains and several distribution boards, each with its own earthing.
- Fuses and SWA. BS 88-2, BS 88-3 and BS 3036 fuses, and armour used as the CPC.
- The reason for every result. Each check lists the regulation it comes from.
| Ib ≤ In 433.1.1(i) | 37.0 A ≤ 40 A |
| Iz = It × Ca × Cg × Ci ≥ In 433.1.1(ii) | 64 A ≥ 40 A |
| Cable | 10 / 4 mm² twin & CPC, method C |
| Volt drop, 14 m 525 | 2.28 V, 0.99% |
| Zs = Ze + (R1+R2) × 1.20 411.4 | 0.46 Ω ≤ 1.09 Ω |
| Disconnection time Table 41.1 | ≤ 0.4 s |
- C1Exposed live conductors at damaged accessory, back bedroomItem 4.4
- C2No RCD protection for socket-outlets that may supply portable equipment outdoors411.3.3
- C2Main protective bonding to gas absent411.3.1.2
- C3No surge protection device fitted443.4
- FICircuit 4 unidentified, further investigation neededItem 6.1
Certificates
EIC, EICR, Minor Works, EV charger, Solar PV, PAT, fire alarm and emergency lighting, laid out after the model forms.
- Observation guide. C1, C2, C3 and FI observations with A4 references, linked to the schedule of inspections.
- Assessment set for you. The overall assessment follows the codes you've given.
- Tables you fill across. Circuit details and test results work like the paper schedule. Return moves down.
- Photos. Add them to any certificate, printed four to a page with their captions.
- Client list. Reuse client and contact details across jobs.
- Next inspection. Start a repeat EICR or PAT job from the last one.
- Send it. Export a PDF or email it through Mail in one click.
Analysis
For bigger jobs, the studies sit beside the design and use the same data.
Fault levels
RMS and peak prospective fault current at each board and circuit, reduced along sub-mains if you choose.
Load and diversity
Maximum demand to the On-Site Guide rules, standby circuits and phase balancing on three-phase boards.
Selectivity
Time–current charts for MCBs, RCBOs, MCCBs with LSIG trip units, and fuses.
Solar PV and battery
String voltages at minimum temperature, MPPT window, string fuses, DC volt drop and G98/G99.
Arc flash
Incident energy per board, with a warning label in the NFPA 70E style, plus a DC calculator.
Generators and UPS
Run the whole design on a standby source to check it still disconnects in time.
Costing, files and exports
Materials list
Built from the design and floor plan: cable by size with wastage, devices, accessories and enclosures.
Your wholesaler's prices
Import trade price lists from each supplier and use the cheapest per item, or pick one supplier.
Reports and drawings
PDF calculation report with schematic and floor plans; DXF for AutoCAD; CSV for Excel.
Revit and MagiCAD
Import panel schedules and export BIM exchange files.
Several jobs at once
Switch between open jobs, each with its own undo history. VoltPlan reopens them next time.
Moving to a new computer
Back up and restore your company details, logo, signatures, client list and price lists in one file.
Pricing
Free to download and free forever for 2 certificates a month. Buy the design tools once, and pay monthly or yearly only if you issue more certificates. Only need certificates? VoltPlan Certificates is a separate app with unlimited certificates.
Launch offerVoltPlan Design is £49.99 until [end date], then £69.99. It's a one-off purchase, so if you buy at the launch price, you keep it.
Free
For the odd job, or to get to know VoltPlan
- 2 certificates a month
- Every certificate type
- Try every design, floor plan and analysis screen
- Certificates marked "Created with VoltPlan"
VoltPlan Certificates
The certificates-only app, for electricians who don't need the design tools
- Unlimited certificates
- EIC, EICR, Minor Works, EV, Solar PV, PAT, fire alarm and emergency lighting
- Your logo and signature on every page
- Photos, client list, PDF and email
- No design tools, so it's simpler to learn
VoltPlan Design
Launch price until [end date], then £69.99. Pay once and keep it
- Save, print and export designs
- Floor plans that measure the cable
- All the analysis studies
- PDF report, DXF, CSV and BIM exports
- Materials list and costing
- 3 certificates included
- Add unlimited certificates any time for £7.99 a month
Design + Certificates
Plus VoltPlan Design, £49.99 once
- Everything in VoltPlan Design
- Unlimited certificates at the owners' price
- Design and certify in the same job file
UK prices in GBP, including VAT. Available now for Windows; the Mac version is coming soon, and on a Mac purchases will be made in the app through your Apple Account.
Compare plans
| Feature | Free | VoltPlan Certificates separate app | VoltPlan Design | Design + Certificates |
|---|---|---|---|---|
| Price | £0 | £9.99 / month or £99.99 / year | £49.99 once (launch price, then £69.99) | £49.99 once, then £7.99 / month or £79.99 / year |
| Certificates | ||||
| Certificates you can issue | 2 a month | Unlimited | 3 included | Unlimited |
| EIC, EICR, Minor Works, EV, Solar PV, PAT, fire alarm and emergency lighting | Yes | Yes | Yes | Yes |
| No "Created with VoltPlan" watermark | No | Yes | Yes | Yes |
| Logo, signatures and photos | Yes | Yes | Yes | Yes |
| Design | ||||
| Use the design, floor plan and analysis screens | Try | No | Yes | Yes |
| Save, print and export designs | No | No | Yes | Yes |
| PDF report, DXF, CSV and BIM exports | No | No | Yes | Yes |
| Export the materials list and price sheet | No | No | Yes | Yes |
Billing questions
Is there a free trial?
There's no time-limited trial, because you don't need one. VoltPlan is free to download, every screen can be tried, and the Free plan lets you issue 2 certificates a month for as long as you like. Free certificates carry a light "Created with VoltPlan" watermark. Designs can be explored but not saved, printed or exported until you buy VoltPlan Design.
How are certificates counted?
- A certificate counts once, the first time it's exported as a PDF, emailed or printed. EIC, EICR, Minor Works, EV charger, Solar PV, PAT, fire alarm and emergency lighting each count as one.
- Exporting, emailing or printing the same certificate again, including after correcting it, is free.
- With VoltPlan Design and no subscription, VoltPlan asks before using one of your 3 included certificates and tells you how many are left.
Will VoltPlan Design go up in price?
Yes. £49.99 is a launch price that ends on [end date]. After that VoltPlan Design will be £69.99. It's a one-off purchase, so if you buy at the launch price, you keep it and pay nothing more for updates to the current edition of BS 7671.
What happens if my subscription ends?
Certificates you've already issued still open, export and print. Only new ones need a subscription. VoltPlan Design is a one-off purchase and never expires.
I use VoltPlan Certificates. Can I move to the full VoltPlan?
Yes. Download VoltPlan and buy VoltPlan Design, then cancel your VoltPlan Certificates subscription. When it ends, subscribe at the owners' price of £7.99 a month or £79.99 a year in VoltPlan ▸ Settings ▸ Purchases.
How do I cancel or change my subscription?
In VoltPlan ▸ Settings ▸ Purchases, choose Manage Subscriptions…. It opens your App Store account, where you can change or cancel at any time.
I've got a new computer. Do I pay again?
No. On a Mac, purchases work on any Mac signed in with the same Apple Account: use Restore Purchases in Settings ▸ Purchases. One purchase also covers VoltPlan for Windows.
VoltPlan in the classroom
VoltPlan is built by an electrician who lectures on electrical courses. It shows the working behind every result, which makes it a good way to learn design and certification as well as do it.
Learners
- See which regulation each design check comes from, and why a cable size passes or fails
- Draw a plan and watch how drops, runs and terminations add up to a cable length
- Practise EICR observations and codes with the built-in guide
- The Free plan includes 2 certificates a month
Colleges and training centres
If you'd like to use VoltPlan with a class, for design projects, inspection and testing practice or portfolio evidence, get in touch to talk about what would help.
Talk to us about your centreRelevant to the courses your learners take
The calculations and forms in VoltPlan cover topics across these qualifications.
- EAL Level 2 and Level 3 Electrical Installation
- City & Guilds 2365
- Inspection and Testing 2391
- 18th Edition 2382
- Design and Verification 2396
- AM2
Help centre
The same guides you'll find in the app under Help ▸ VoltPlan Help (⌘?), covering every screen and option.
Common questions
Where are my jobs?
In the default folder set in VoltPlan ▸ Settings ▸ Files (Documents ▸ VoltPlan to start with). Jobs save automatically as .voltplan files. Click Jobs ▸ Show in Finder to find the one on screen.
Moving to a new Mac
Copy your jobs folder across. On the old Mac use File ▸ Back Up Settings & Clients…, and on the new one File ▸ Restore Settings & Clients…. That brings your company details, logo, signatures, client list and price lists. Then use Restore Purchases in Settings ▸ Purchases.
Prices on the materials list
VoltPlan doesn't include trade prices. Ask your wholesaler for your price list as a CSV file and add it in VoltPlan ▸ Settings ▸ Prices.
Managing your subscription
Manage or cancel in your App Store account settings, or from Settings ▸ Purchases ▸ Manage Subscriptions…. If a subscription ends, your existing certificates still open and export.
Getting started
Welcome to VoltPlan
VoltPlan designs and checks electrical installations to BS 7671:2018+A4:2026 (or IEC 60364). You set the supply, add boards and circuits, draw the floor plan with its accessories, and VoltPlan sizes the cables, measures the cable routes, checks every circuit, and produces the schematic, PDF report, certificates and materials list.
Your first design in ten steps
- Supply & project (⌘1): enter the project name, address and designer, then the earthing arrangement, U₀, Ze and prospective fault current.
- In the sidebar under DB1 — Consumer unit, click Add circuit for each circuit (lighting, sockets, cooker and so on).
- For each circuit set the Load type, Design current Ib, Device and Curve. Leave Size automatically on to let VoltPlan pick the cable.
- Floor plan (⌘2): draw the rooms with Draw room or Add room.
- Place the consumer unit: Tool menu ▸ Consumer unit / DB, then click near the wall where it goes.
- Add doors and windows with the Door, Double door and Window tools.
- Set Wire new items on: to a circuit, choose an accessory tool (sockets, switches, lights) and click to place them.
- Check each circuit's route under Cable routes in the side panel, and tick Use this length in the calculation.
- Look at each circuit's results (pass/fail checks, cable size, volt drop, Zs).
- Export: File ▸ Export ▸ PDF Calculation Report… (⇧⌘E), the certificates, or the materials list.
Tip. Every change can be undone with ⌘Z, and changes are saved automatically (see Projects, saving and undo). Doing a certificate on an existing installation? Use File ▸ New Certificate — no design needed.
Projects, jobs and saving
Each project is a job: a design, a certificate, or both. You can have several jobs open at once and switch between them.
Starting and opening jobs
- File ▸ New Project (⌘N) starts a new design.
- File ▸ New Certificate starts a job straight on a certificate, without a design: EICR (⌥⌘N), EIC, Minor Works, EV Charger, Solar PV, PAT or Fire Alarm. It opens on the Certificates screen with your details filled in (an EIC or EICR starts with one empty consumer unit).
- File ▸ Open Project… (⌘O) opens a saved job. If it's already open, VoltPlan just switches to it.
- Starting or opening a job never closes the one you were on: it stays open in the Jobs list.
Open jobs
Every open job is listed under Open jobs at the top of the sidebar, with its file name; the one on screen has a tick.
- Click a job to switch to it. Each job keeps its own screen, certificate tab and undo history.
- Red ⊖ button: deletes the job. It's closed and its file moved to the Bin (you can put it back from the Bin). A job that was never saved is simply discarded.
- The Jobs button at the top of the sidebar (it shows how many are open) lists the jobs too, with New Project, New Certificate, Open Project…, Show in Finder, Close and Delete for the job on screen.
- File ▸ Switch to Job and File ▸ Close Job (⇧⌘W) do the same from the menu bar. Close keeps the file; Delete bins it.
Starting VoltPlan
- VoltPlan reopens the jobs you had open when you last quit, on the job you were looking at.
- When there's nothing to reopen, the Welcome window offers New EICR, New EIC, New Minor Works, New EV Charger, New Solar PV, New Fire Alarm, New PAT, New Design Project, Open…, the sample design to explore, and your recent jobs.
- File ▸ Welcome to VoltPlan… shows it again at any time. Closing or deleting the last job leaves no job open — the window shows No job open with buttons to start a certificate or design, open a saved job or show this welcome again. Nothing is created until you choose.
Saving
- Changes are saved automatically, a moment after you make them, and before you switch job, close a job or quit.
- A new job is saved in your default folder (Documents ▸ VoltPlan unless you choose another in Settings ▸ Files) the first time it changes, named after the project, e.g.
EICR.voltplan. - File ▸ Save Project (⌘S) saves now; Save Project As… (⇧⌘S) renames or moves the job.
- Projects are .voltplan files. Double-click one in the Finder to open it in VoltPlan. Older .json projects still open: VoltPlan saves them as .voltplan beside the old file straight away and moves the old .json to the Bin (put it back from the Bin if you need it).
- Turn auto save off in Settings ▸ Files if you prefer to save by hand; VoltPlan then asks before closing a job with unsaved changes.
Undo and redo
- Edit ▸ Undo (⌘Z) and Redo (⇧⌘Z), or the curved arrows on the floor plan tool bar.
- Undo covers every change to the job on screen. Quick successive edits, such as a drag or typing a number, count as one step.
Tip. A job holds everything: supply, boards, circuits, floor plan, certificates and prices typed for it. Supplier price lists, your client list, company details and certificate settings are shared by every job.
Finding your way around
The sidebar
- Jobs (top of the sidebar): the jobs open in this session. See Projects, jobs and saving.
- Installation: Supply & project, Floor plan, Schematic.
- Analysis: Fault levels, Load & diversity, Selectivity (TCC), Arc flash, Solar PV & battery, Busbar trunking.
- Documents: Costing & materials and Certificates. The job's certificates are listed under Certificates (for example “EICR – Mrs J Smith”, with a green tick once complete) — click one to open it. See Certificates in a job.
- Boards: one section per board (DB1, DB2…) listing its circuits, each with a tick or cross for pass/fail, then Add circuit and Add distribution board. Right-click a board or circuit to add, duplicate or delete; the Delete key deletes the selected one.
Keyboard shortcuts for screens
- ⌘1 Supply & project · ⌘2 Floor plan · ⌘3 Schematic
- ⌘4 Fault levels · ⌘5 Load & diversity · ⌘6 Selectivity · ⌘7 Arc flash · ⌘8 Solar PV · ⌘9 Busbar trunking
- ⌘0 Materials list · ⌘, Settings · ⌘? this Help
Menus
- VoltPlan: About VoltPlan (version, help and feedback), A Note from the Developer… (also shown each time VoltPlan opens), Check for Updates…, Settings (⌘,, opens on Company) and Company Details….
- File: Welcome to VoltPlan…, new project, New Certificate, Next Inspection from This Job, open, Switch to Job, Close Job, Back Up / Restore Settings & Clients…, save, print, and the Import and Export menus.
- Edit: Undo, Redo, Add Address… and Address Book… (see Address book).
- Analysis: the studies, Balance Phases on All Boards, the Standard (BS 7671 or IEC 60364), Run Calculations On (normal supply or the standby source) and the sub-main options.
- Certificates: certificate details, Certificate Settings, Copy Design to EIC, PDF export of the EIC, EICR, Minor Works, EV charger, Solar PV, fire alarm and PAT certificates, Export Limitations & Deviations (CSV)… and Email Certificate.
- Costing: materials list, My Prices…, price updates and price sheets.
- Help: this Help (⌘?) and Send Feedback… — also the speech-bubble button next to Help in the tool bar. VoltPlan is still in development: report faults and send ideas there, and you'll get a reply by email.
Buying VoltPlan
VoltPlan is free to download. Every screen can be tried, and the Free plan lets you issue 2 certificates a month, free forever. Designs can be explored but not saved, printed or exported until you buy VoltPlan Design.
What you can buy
- VoltPlan Design, £49.99 one-off (launch price until [end date], then £69.99)
- Save, print and export designs (PDF report, DXF, CSV, BIM), with 3 certificates included.
- Certificates for VoltPlan owners
- Unlimited certificates, £7.99 a month or £79.99 a year (12 months for the price of 10).
- Certificates only
- Unlimited certificates without VoltPlan Design, £9.99 a month or £99.99 a year.
How certificates are counted
- A certificate counts once, the first time it's exported as a PDF, emailed or printed. EIC, EICR, Minor Works, EV charger, Solar PV, PAT, fire alarm and emergency lighting each count as one.
- Exporting, emailing or printing the same certificate again, including after correcting it, is free.
- Free-plan certificates carry a light Created with VoltPlan watermark. It goes once you buy VoltPlan Design or subscribe, including if you export a free one again.
- If a subscription ends, certificates you've already issued still open, export and print. Only new ones need a subscription.
Settings ▸ Purchases
- Shows what you own, your subscription and when it renews or ends, and certificates left.
- Restore Purchases after reinstalling or on a new Mac. Manage Subscriptions… opens your App Store account to change or cancel.
- Purchases work on any Mac signed in with the same Apple Account.
Design
Supply & project
The Supply & project screen (⌘1) sets the details that appear on the report and the supply every circuit is checked against.
Project
- Project name
- Shown on the report, certificates and exports.
- Installation address
- Used on the report and certificates.
- Designer
- Your name for the report.
- Standard
- BS 7671:2018+A4:2026 or IEC 60364. Also on the Analysis menu.
Supply characteristics at the origin
- Earthing arrangement
- TN-S, TN-C-S (PME) or TT. Sets disconnection times and the RCD rules.
- Supply
- Single-phase or three-phase. Three-phase shows the line voltage and three-phase fault level, and is printed on the certificates as the live conductors.
- U₀ (V)
- Nominal voltage to earth, normally 230 V.
- Line voltage (V)
- 400 V for a three-phase supply.
- Ze (Ω)
- External earth fault loop impedance, measured or the DNO maximum (0.8 Ω TN-S, 0.35 Ω TN-C-S). For TT, the electrode resistance.
- Prospective fault current (kA)
- Single-phase PFC at the origin, checked against every device's breaking capacity. 6 kA by default (typical for a domestic supply); pick another common value from the drop-down or type the measured figure.
- Cmin
- Voltage factor used for maximum Zs (0.95 under BS 7671).
Sub-mains
- Count sub-main volt drop in downstream circuits
- Adds the sub-main's volt drop to circuits on the board it feeds, because Appendix 12 limits are from the origin to the load.
- Reduce the PFC along sub-mains
- Works out a lower PFC at each sub-board. Off carries the origin PFC down unchanged, which is conservative for breaking capacity.
Standby generator, UPS or CHP
You can check the whole design on a standby source as well as the normal supply.
- On Supply & project, tick Standby generator / UPS / CHP.
- Choose the Type and enter the Name, Rating (kVA), Three-phase and Earthing.
- For a generator or CHP enter X″d (subtransient reactance) and X0 (zero-sequence reactance). For a UPS enter its Fault current (× rated current).
- VoltPlan shows the Rated current, Fault current and the Equivalent Ze this source gives.
- Set Run calculations on (here or on the Analysis menu) to the standby source to check every circuit on it.
Tip. A generator's much higher Ze often fails Zs where the mains passes. Check the results on both supplies.
Boards and sub-mains
Adding a board
- In the sidebar, click Add distribution board (or hold + at the bottom of the sidebar and choose New distribution board).
- Click DBx board details in the sidebar to set it up.
Board details
- Reference
- DB2, DB-GAR and so on. Used in circuit references (DB2-1).
- Description / location
- Shown on the schedule and report.
- Fed from
- Origin (supply), or a distribution circuit on another board (a sub-main).
- Earthing at this board
- Follow the supply, or set TN-S, TN-C-S or TT.
- Electrode resistance RA
- For a TT board (an outbuilding with its own rod). Used as Ze; 100 Ω until you enter a measured value.
- Phases
- Single-phase or TP&N.
- Busbar rating and Icc
- Checked against the board's maximum demand and its prospective fault current.
Feeding a board from another (sub-main)
- On the board that supplies it (e.g. DB1), click Add circuit.
- In the circuit's details set Role to Distribution circuit, give it a description, choose the cable (e.g. SWA) and the device.
- Open the fed board's details (e.g. DB2 board details) and set Fed from to that circuit.
- Ze at DB2 becomes the Zs at the end of the sub-main, so every circuit on DB2 is checked with it included.
- On the floor plan, the sub-main's route runs from DB1's symbol to DB2's symbol.
- The sub-main carries DB2's maximum demand in Load & diversity.
Placing the board on the plan
Floor plan ▸ Tool ▸ Consumer unit / DB, then click. Select the symbol and choose its Board in the side panel if it isn't linked automatically. Every circuit on that board starts its route at the symbol.
Circuits
Adding, copying and deleting
- Add circuit under a board in the sidebar, or + at the bottom of the sidebar.
- Right-click a circuit for Duplicate or Delete…. Delete also offers to remove the circuit's items from the plan.
Circuit
- Reference / Description
- e.g. 1, “Sockets downstairs”.
- Board
- The board it's on.
- Load type
- Lighting, socket-outlets or fixed equipment.
- Wiring method
- Lighting only: 3-plate (loop-in at rose), loop-in at switch, or junction box. See Lighting circuits.
- Arrangement
- Sockets only: Radial or Ring.
- Role
- Final circuit, or Distribution circuit for a sub-main feeding another board.
- Supply
- Single-phase or three-phase circuit.
Load & route
- Design current Ib (A)
- The circuit's design current.
- Phase
- Which phase it's on, on a TP&N board.
- Demand category
- Used for maximum demand (OSG Appendix A).
- Cooker control unit has a socket-outlet
- Adds the 5 A allowance for cooker diversity.
- On standby
- Leaves the circuit out of maximum demand but still checks it.
- Length
- Typed, or from plan when the route is linked. Edit route on floor plan jumps to it.
Cable
- Cable type
- 6242Y twin & earth, 6491X singles, XLPE SWA and so on.
- Reference method
- How it's installed (Appendix 4 methods: clipped direct, in conduit, in insulation…). Flat twin and earth has methods 100–103, A, B and C from Table 4D5.
- Size automatically
- On: VoltPlan picks the smallest size that passes every check. Off: choose Line conductor (mm²) yourself and it's checked as entered.
- Specify CPC size
- For cables without a fixed CPC (singles, SWA). Twin & earth uses its own CPC.
Installation conditions
- Ambient temperature (°C)
- Gives the Ca factor.
- Circuits grouped / Grouping
- Gives the Cg factor (Table 4C1).
- Length in thermal insulation
- Gives the Ci factor for a cable totally surrounded by insulation (Regulation 523.9, Appendix 4 section 2.6).
Protective device
- Device / Curve
- MCB, RCBO or MCCB with curve B, C or D, or a fuse: BS 88-2 (gG cartridge), BS 88-3 (BS 1361 cartridge) or BS 3036 (rewirable). Fuses have no curve. See Fuses and SWA armour.
- Rate automatically from Ib
- On: the smallest standard rating ≥ Ib. Off: choose In yourself.
- From equipment library
- Use a specific product (with its let-through I²t and breaking capacity).
- Breaking capacity
- 6 kA, 10 kA… Checked against the PFC.
- Protected by upstream RCD / RCD IΔn
- For additional protection and fault protection where Zs fails.
Fuses and SWA armour
Choosing a fuse
- Open the circuit and set Device to a fuse: BS 88-2 (gG cartridge, industrial), BS 88-3 (cartridge, formerly BS 1361, older domestic boards) or BS 3036 (rewirable).
- Pick the rating. The Curve picker disappears — fuses don't have one.
- Set the Breaking capacity: the list changes to suit the fuse (for example 1, 2 or 4 kA for BS 3036).
- Changing to a fuse turns off RCD protected (a fuse is not an RCBO). Tick Protected by upstream RCD if an RCD covers the circuit.
What changes in the checks
- Maximum Zs comes from the fuse's 0.4 s or 5 s time (Tables 41.2 and 41.4 style data).
- The adiabatic check uses the fuse's own operating time at the fault current.
- BS 3036 fuses need the cable's current-carrying capacity to be at least In ÷ 0.725 (Reg 433.1.202). This is shown as its own check: “Current-carrying capacity (rewirable fuse)”.
- The selectivity (TCC) graph draws fuse curves too.
SWA armour as the CPC
- Choose a steel-wire armoured cable (SWA).
- Turn on Armour as CPC in the cable section. A 2-core SWA then uses its armour, not a spare core, as the protective conductor.
- R1+R2 and Zs use the armour's resistance, and the adiabatic check uses k = 46 (XLPE) or 51 (PVC) for steel armour.
- The cable description reads “… SWA-XLPE, armour as CPC”.
Tip. The fuse curves and armour figures are development data. Check them against BS 7671 Tables 41.2 and 41.4, Appendix 3 and the cable maker's data before relying on a result.
Results and checks
Each circuit's results show what it was calculated to, every compliance check with pass or fail, notes, and the sizes evaluated.
What's checked
- Ib ≤ In ≤ Iz: Iz = It × Ca × Cg × Ci (433.1.1, Appendix 4).
- Volt drop: 3 % lighting / 5 % other on a public supply, 6 % / 8 % private (525, Appendix 12). Counted from the origin if the sub-main option is on.
- Zs ≤ maximum Zs: Zs = Ze + (R1+R2) × 1.20 (70 °C) or 1.28 (90 °C), max = Cmin × U₀ / Ia (411.4, Table 41.3).
- Disconnection time: 0.4 s / 5 s TN, 0.2 s / 1 s TT (Table 41.1). An RCD covers Zs where the MCB fails (Table 41.5).
- CPC adiabatic: S = √(I²t) / k (543.1.3).
- Breaking capacity against PFC (434.5.1) and live conductors k²S² ≥ I²t (434.5.2).
- 30 mA RCD for socket-outlets up to 32 A (411.3.3).
- Touch voltage (411.3.2, 411.5.3), and for MCCBs Ib ≤ Ir ≤ Iz.
Sizes evaluated
The table lists every cable size tried with It, Iz, volt drop, Zs and max Zs, so you can see why a size was chosen or failed.
Tip. A failed check shows in red with the regulation number. The sidebar tick turns to a cross for any circuit with a fail.
Ring final circuits
- Set the circuit's Load type to socket-outlets and Arrangement to Ring.
- Place the sockets on the plan on that circuit. The route returns to the board after the last socket.
- The length is the whole ring. R1+R2 and volt drop use L/4.
- Iz must be at least 20 A and conductors at least 2.5 mm² (433.1.204). You're warned if the device isn't 30 or 32 A.
- Fed from isn't offered on rings: put the sockets in order with Wiring order instead.
Floor plan
Floor plan basics
Tip. The bar under the plan tells you what the tool in use does. It wraps onto two lines in a narrow window; hover over its ⓘ for the whole hint, or click it for Show Help…, which opens the help page for that tool.
The tool bar
- Panel button
- Shows or hides the side panel.
- Undo / Redo arrows
- Same as ⌘Z / ⇧⌘Z.
- Tool
- Select / move, Draw room, Door, Double door, Window, 2-way switch, and every accessory.
- Door buttons
- Turn, swap hinge, open in/out. Only shown with a door selected.
- Wire new items on:
- The circuit new sockets, switches and lights go on.
- Show circuits
- Tick which circuits' routes are drawn.
- Fit and zoom
- Fit zooms to show the whole plan; the slider zooms in and out. You can also pinch on the trackpad.
- Bin
- Clears the whole plan, after a confirmation.
The side panel
- Selection: details of the selected room, door, window or accessory.
- Rooms: every room with its size; Add room.
- Cable routes: every circuit's route; click one for its details.
- Plan settings: default ceiling height, standard mounting heights, allowance per termination and wastage.
Plan settings
- Default ceiling height (m)
- 2.4 m unless changed. Each room can override it.
- Sockets — floor to base (mm)
- 450 mm.
- Switches/FCUs — floor to top (mm)
- 1200 mm.
- Wall lights — floor to base (mm)
- 1800 mm.
- Cooker switch — floor to base (mm)
- 1050 mm: the bottom of the switch about 150 mm above a 900 mm worktop.
- Cooker outlet plate — floor to base (mm)
- 600 mm.
- Consumer unit — floor to base (mm)
- 1350 mm.
- Drops run past the box
- On by default: a cable dropping to (or rising to) a box is measured to its far side, as it's installed, not just to the top of the box.
- Extra past each box (mm)
- 15 mm added beyond each box for the termination loop. Change it to suit how you work.
- Extra at the consumer unit / board (mm)
- 500 mm added where each cable reaches the consumer unit or a distribution board, to dress it round the enclosure to its terminals. Used there instead of the past-box allowance.
- Allowance per termination (m)
- 0.2 m added at each end of every cable.
- Wastage on purchase (%)
- Added to order lengths (10 %).
Tip. Heights on the plan are in mm. A * after a height means it's been changed from the standard.
Rooms
Drawing a room
- Tool ▸ Draw room, then drag out a rectangle (it snaps to 100 mm), or click Add room in the side panel.
- Select the room and set its Name, Width, Length and ceiling height in the side panel.
Moving a room
- Drag it. It follows the mouse and carries its accessories.
- Its walls snap into line with other rooms' walls when close, shown by a pink dashed guide. Otherwise its corner snaps to the 0.1 m grid.
- It can't go above or left of the plan's origin.
Resizing a room
- Drag any corner. The selected room shows square handles on its corners.
- The opposite corner stays put. The size steps in 50 mm or lines up with another room's wall. Rooms stay at least 0.5 m each way.
- Doors and windows keep their place along the walls; accessories on a wall that moves go with it; anything left outside is pulled back in.
Tip. Grab a room near its middle to move it. Clicking just inside a corner resizes it.
Other room settings
- Standard ceiling
- Untick to give this room its own ceiling height (used in drop lengths and changes in ceiling height between rooms).
- Position x / y (m)
- Exact position of its top-left corner.
- Delete room
- Removes the room and its doors and windows.
Doors and windows
Placing
- Tool ▸ Door, Double door or Window.
- Click on or near a wall. The opening is centred where you click and its details pop up.
Editing
- Single click selects it, with its settings in the side panel.
- Double-click opens the pop-up with all its details.
- Wall
- Which wall of the room it's on.
- From corner (mm)
- Distance from the measured corner: top and bottom walls measure from the left-hand corner, left and right walls from the top corner.
- Width / Height / Sill
- Sizes in mm. Sill is for windows.
- Hinge
- Which jamb it's hinged on (for double doors, which leaf opens first).
- Opens into the room
- Swing in or out.
Moving
- Drag it by its wall line or its door leaf. It slides along its wall, round a corner onto the next wall, or across to a nearby room's wall.
- On a wall two rooms share, it stays with its own room so its swing doesn't flip.
- With it selected, the arrow keys move it 50 mm; the buttons in its details move it 10 or 100 mm.
Changing which way a door opens
Select the door, then:
- R turns it: each press turns the swing a quarter, through all four ways.
- H moves the hinge to the other side.
- F makes it open into or out of the room.
The same three buttons are on the tool bar and in the door's details (Turn, Swap hinge, In / out).
Light switch by a door
In a door's details, Add light switch on latch side places a switch 150 mm from the frame on the side it opens from, wired on the circuit in Wire new items on.
Placing accessories
- Set Wire new items on: to the circuit.
- Choose the accessory from the Tool menu: double or single socket-outlet, light switch, ceiling light point, wall light, fused connection unit, cooker control unit, cooker outlet, smoke/heat alarm, junction box, or consumer unit / DB.
- Click on the plan. Wall items snap to the nearest wall within 0.6 m; ceiling items go where you click.
Accessory details
- Type / Label
- Change what it is; give it a label (shown instead of its type).
- Circuit
- Move it to another circuit. It joins that circuit's route.
- Fed from
- Where its cable comes from. See Cable routes.
- Standard height
- Untick to set its own height (mm to base or top, as shown).
- Room / Position
- The room it's in and its exact position.
- Delete accessory
- Or press the Delete key.
- Drag an accessory to move it. Wall items snap back onto the wall when you let go.
- Items with the same name in a room are numbered in wiring order, e.g. “Ceiling light point 2 — Lounge”.
Tip. A warning shows if a wall item sits inside a door or window opening.
Floors and architect's drawings
Adding floors
- Click the floor button on the plan tool bar (it shows Ground floor) and choose Add floor, or click Add floor in the side panel.
- The first time, everything already drawn becomes the ground floor. The new floor is placed one ceiling height plus 0.3 m above the floor below.
- Switch floors with the same button. Only that floor's rooms, accessories and cables are shown.
- Rename a floor and set its level (m above ground) in the side panel's Floor section.
- A circuit can serve several floors. Where its cable goes up or down to another floor, a ↕ marker shows where it leaves, and the riser length (the difference in level) is added to the route.
- Remove this floor works on an empty floor only. Move or delete its rooms and accessories first.
- The PDF report draws each floor as its own plan.
Importing an architect's drawing
- In the side panel, click Import architect's drawing (PDF or image)…, or use the floor button ▸ Import drawing.
- Choose a PDF (the first page is used) or a PNG, JPEG or TIFF image. It appears faded under the current floor.
- VoltPlan switches to Set drawing scale: click two points a known distance apart (the ends of a dimensioned wall are ideal).
- Type the real distance in metres and click Set scale. The drawing is resized so the plan matches it.
- Draw your rooms over the drawing, then place the accessories as usual.
- Fade
- How strongly the drawing shows. Lower it once your rooms are drawn.
- Drawing width (m)
- The drawing's real width. Set scale works this out for you.
- Left edge at x / Top edge at y
- Moves the drawing so it lines up with rooms already drawn.
- Set scale / Replace… / Remove
- Re-scale, swap the drawing for a new revision, or take it away.
Tip. DWG files can't be read directly. Open the DWG in your CAD program or a free viewer and save or print it as a PDF, then import the PDF.
Cable routes and lengths
Each circuit's cable runs from its board's symbol through its accessories. VoltPlan measures it as a series of legs: down or up from the box to the run height, across parallel to the walls, any change in ceiling height between rooms, then down or up to the next box. The line drawn on the plan takes the way round that stays inside the rooms (so a sub-main between two boards doesn't cut outside the building); the measured length is the same whichever way it's drawn.
Line styles
- Heavy line: the circuit cable.
- Thin line: switch drops and light feeds (twin & CPC).
- Dotted line: strappers between 2-way and intermediate switches (3-core & CPC).
- Cables of one circuit that share a run are drawn side by side.
Route details (side panel ▸ Cable routes ▸ click a circuit, or click a route on the plan)
- Run via
- Ceiling void (drops down), floor void (rises up) or skirting/dado trunking (150 mm).
- Use this length in the calculation
- Replaces the typed length with the measured one for volt drop and Zs.
- Wiring order
- The order the cable visits the items. Use the arrows to change it.
- Legs
- Each leg: drop + run + step + drop.
- Route length / terminations / order length
- Design length = route + 0.2 m per termination; order length adds wastage.
- Furthest point
- The longest path from the board, used for volt drop and Zs on branched circuits.
- Straighten
- Shown when the route has bend points: removes them all.
Bending a route round obstacles
- With Select / move, click a cable route on the plan to highlight it.
- Drag the highlighted line to where the cable really goes. A bend point (a small circle) is added where you grabbed it.
- Drag a bend point to move it. Double-click one to remove it, or click Straighten in the route details to remove them all.
- The cable is measured through the bend points, square to the walls, so the length (and volt drop and Zs, if the route's length is used in the calculation) follows the route you draw.
- Bend points stay where you put them if you move an accessory later — straighten the route and bend it again if it no longer makes sense.
- Edit ▸ Undo takes back a bend like any other change.
Fed from: choosing where an item's cable comes from
- By default each item is fed from the one before it in the wiring order (the first from the board).
- In an item's details, Fed from lists the board (consumer unit) and every switch, light or socket on the circuit cable. Pick one and the cable runs from there.
- Only the cable into the item changes. Whatever it fed stays with it.
- If you pick an item that's currently fed through this one, the two swap places.
- Back on the loop (wiring order) undoes it.
- Not offered on ring finals.
Tip. If there's no consumer unit symbol on the plan, routes start at the first accessory.
Lighting circuits
Wiring method (in the circuit's details)
- 3-plate (loop-in at rose)
- The circuit cable loops rose to rose; each switch has a drop from its rose.
- Loop-in at switch
- The circuit cable loops switch to switch; each light is fed from its switch.
- Junction box
- The circuit cable loops between junction boxes; each light and switch drop is fed from the nearest box. Place junction boxes with the Junction box (ceiling) tool.
Which switch works which light
- A new switch works the light you choose under Controls light in its details; until then it isn't wired, and its details say so. Choose Nearest light (auto) to let it take the nearest light that doesn't already have a switch, preferring one in the same room.
- Selecting a switch rings the lights it works and any other switches on them.
One switch working several lights
- Select the switch.
- Under Also switches, tick the other lights, or click Tick all lights in the room.
- The switched feed runs from the switch's light to the nearest ticked light, then on to the next. Those lights come off the circuit cable.
2-way and intermediate switching
- 2-way switch tool: Tool ▸ 2-way switch, click where it goes, then pick which switch it pairs with from the pop-up.
- Add 2-way switch in a switch's or light's details, then click where the new switch goes.
- 2-way with in a switch's details pairs an existing switch.
- A 2-way switch's details only ask 2-way from: pick the main switch (the one the circuit cable reaches). It joins that switch's circuit and works its light — no circuit, Fed from or light of its own to set.
- A third switch on the same light becomes an intermediate.
- Strappers (3-core & CPC) run switch to switch only, never to the light.
Feeding switches from each other (loop-in at switch)
- The circuit cable reaches the first switch of each light, then loops on.
- To feed a switch from another, select it and set Fed from to that switch.
- On a 2-way pair, setting Fed from on either switch makes it the one the circuit cable reaches.
Worked example: a lounge with a 2-way
- Add a lighting circuit, set Wiring method to Loop-in at switch.
- On the plan, set Wire new items on to it and place the ceiling lights in the lounge.
- Place a Light switch by the door, then under Controls light choose the lounge light.
- Select the switch, and under Also switches click Tick all lights in Lounge.
- Choose Tool ▸ 2-way switch, click on the far wall and pick the door switch in the pop-up.
- If the door switch should be powered from another room's switch, select it and set Fed from to that switch.
- Under Cable routes, click the circuit and tick Use this length in the calculation.
- Result: circuit cable to the door switch, switched feed light to light round the lounge, and a dotted strapper to the 2-way.
Worked example: sockets
- Add a circuit, set Load type to socket-outlets and Arrangement to Radial or Ring.
- Set Wire new items on to it and place the double socket-outlets round the rooms.
- Under Cable routes, click the circuit and check the Wiring order; use the arrows to go round the room sensibly.
- On a radial, use Fed from on a socket to run a spur-style cable from another socket.
- Tick Use this length in the calculation. Turn Size automatically off in the circuit if you want a set size such as 2.5 mm².
Analysis
Schematic
The single-line diagram (⌘3) is drawn automatically from the boards and circuits, origin first, with sub-mains feeding their boards.
- Click a circuit to select it; double-click or Open circuit to edit it.
- Export DXF… saves it for AutoCAD. It's also in the PDF report.
Fault levels
RMS and peak fault currents at each board and at both ends of each circuit (⌘4).
- Ik start / end
- Single-phase prospective fault current at the start and end of the circuit.
- Ik3 end
- Three-phase value (defaults to 2 × single-phase unless entered).
- Peak start
- κ × √2 × Ik, with κ from X/R.
- Min. If end
- The smallest fault current, used for disconnection.
- Breaking
- Device breaking capacity Icn against the fault current.
- Reduce the PFC along sub-mains
- Each board's PFC and X/R come from the end of its sub-main.
Load & diversity
Maximum demand (⌘5) uses the IET On-Site Guide Appendix A household rules, or a custom percentage per circuit.
- Each circuit shows its category, connected current, diversity, standby, phase and demand.
- A sub-main carries the demand of the board it feeds.
- Balance phases (or Analysis ▸ Balance Phases on All Boards) spreads circuits across L1–L3 on TP&N boards.
- Boards with a busbar rating are checked against their maximum demand.
Selectivity (TCC)
Compares time–current curves of two devices (⌘6).
- Pick an Upstream and a Downstream circuit, or a pair from Sub-main ↔ outgoing devices.
- The chart shows each device's band and whether they're selective.
- MCB / RCBO bands come from BS EN 60898 / 61009 limits. MCCBs use their LSIG settings with ±10 % current and ±20 % time tolerance; the ground-fault curve is drawn and checked separately.
Tip. Bands are indicative. Confirm critical selectivity with the manufacturer's tables.
Arc flash
An add-on (switch it on in Settings ▸ Add-ons). Works out incident energy at the working distance and the arc flash boundary for each board (⌘7).
- Board / Model / Equipment
- Which board, the IEEE 1584 model and the equipment type.
- System voltage / Solidly earthed
- From the supply; change if needed.
- DC arc flash
- Separate calculator for batteries, PV and DC distribution: voltage, resistance, gap, working distance, arc duration, enclosure.
- A warning label is produced for the board.
Tip. Results are for guidance and must be reviewed by a competent person.
Solar PV & battery
Designs a PV array, inverter and battery (⌘8).
- Enter the PV module datasheet values (Pmax, Voc, Isc, Vmp, Imp, temperature coefficients, maximum series fuse, maximum system voltage).
- Bifacial: bifaciality factor and rear irradiance ratio give the current correction k.
- Array: minimum and maximum cell temperatures, longest string cable run and string cable size.
- Inverter: AC power, phases, maximum DC voltage, MPPT window and maximum input Isc.
- Battery storage: capacity, voltage, charge/discharge power, depth of discharge, AC-coupled inverter.
- Checks: string Voc at minimum temperature, MPPT window, string fuses, DC volt drop, G98/G99, battery DC current.
- Add inverter AC circuit puts the inverter's AC circuit on the current board, marked standby so it doesn't add to demand.
Busbar trunking
Sizes busbar trunking (⌘9): enter design current, protective device In, length, ambient, power factor, three-phase, and whether the load is distributed along the run (rising main / tap-offs). The ratings evaluated are listed with their checks.
Tip. Uses generic copper busbar data (IEC 61439-6). Replace it with the manufacturer's figures for a real job.
Documents
Certificates (EIC and EICR)
An add-on (Settings ▸ Add-ons). Add an EIC or EICR to the job with Certificate: and Add at the top of the Certificates screen (see Certificates in a job), or start a job with File ▸ New Certificate ▸ EICR / EIC when there's no design. The tabs follow the order of the paperwork: Details & supply, Circuits, Schedule of test results, EICR observations and Schedule of inspections.
Details & supply
- EICR overall assessment at the top: SATISFACTORY or UNSATISFACTORY. It changes to UNSATISFACTORY when a C1, C2 or FI observation is added, and back to SATISFACTORY when the last one is removed. A new report stays Not decided until you or the codes decide; you can always change it yourself.
- Client: Edit… opens name, address, email and phone (tick Save to my client list to keep them). Add Client… adds a new client to your list, Search Clients… picks one you've saved, and Copy from Design uses the design's installation address. See Client list.
- Installation address: type it here for a job without a design; left empty, the design's address is used.
- Certificate number, type of work, description and extent, date, next inspection (years, plus the reason, e.g. rented property), departures and comments — the long ones open a box to write in.
- Design, Construction (EIC) and Inspection & testing, plus Authorised for issue by. The switch in a heading takes that person off the certificate. Signatory picks a saved name and signature; Position has Owner, Qualified Supervisor and more, or type your own.
- Installation details (EICR): occupier, description of premises, estimated age of wiring, evidence of additions or alterations and their age, installation records available and who holds them, date of last inspection, previous certificate number.
- Supply and earthing: measured Ze and PFC (the design figure is shown faintly), polarity, means of earthing (distributor's facility or earth electrode), method of fault protection, maximum demand (design figure shown), earthing and bonding conductors, what's bonded, main switch BS (EN) (pick from the list or type), rating and location, front-end RCD type, IΔn, time and type S, and the test instrument.
Circuits
The schedule of circuit details as a table you fill in across, one row per circuit, by board. It works with or without a design.
- Add Circuit adds the next row under a board; Add Board adds a board.
- Columns: circuit number, designation, ring, points, wiring type, reference method, live and cpc sizes, max disconnection time, device, curve, rating, kA, RCD, RCD type, and Max Zs (shown for you).
- Wiring type (from the cable) and max disconnection time (from the circuit and earthing, Table 41.1) are filled in for you. They follow the cable and earthing until you pick a different value yourself.
- RCDs: Add RCD puts an RCD (RCCB) at the bottom of the board's list. It protects the circuits below it, down to the next RCD — add RCD 1, its circuits, then RCD 2 and its circuits. Fill in its BS EN, type, rating, IΔn, poles, type S, trip time and test button on its orange line, and move it with the arrows. Circuits above the first RCD are unprotected; RCBOs keep their own IΔn.
- The copy button duplicates a circuit (not its readings) under the same RCD; the bin deletes it.
- Board Details… (also on the test results tab): location, make and type, supply device, SPD and whether it shows functional, Zdb and Ipf measured at the board, polarity, phase sequence, tested by, and the instruments used for each test.
- On a designed job the table shows what the design chose. Anything you change is kept as entered (automatic sizing is switched off for that value).
Schedule of test results
- For each circuit: ring r1 / rn / r2 (if switched on in Certificate Settings), R1+R2, R2, test voltage, insulation resistance L–L and L–E, polarity, Zs, Ipf, RCD time and test button, AFDD test button, and whether the circuit is vulnerable to testing.
- Expected R1+R2 comes from the design; measured Zs is checked against 80 % of the maximum (readings taken cold). Max Zs is shown at 80 % or 100 % as set in Certificate Settings.
- Add Circuit and the pencil on a row open the circuit's details for quick changes.
- Each board's RCDs appear in the list above the circuits they protect, with boxes for the RCD's trip time at IΔn and test button (OK / FAIL shown against 300 ms, or 500 ms for type S).
EICR observations
- Reason for the report (pick from the list or type), extent, agreed and operational limitations — one per line (each prints as a numbered row), limitations agreed with, and general condition.
- Add Observation…: choose Section → Item → Observation from the built-in guide to fill in the wording, regulation (BS 7671:2018+A4:2026) and a suggested code, or type your own. The codes are guidance only — you decide.
- Link each observation to its Schedule of inspections item; its code then goes straight onto that item (if several observations are linked to the same item, the most serious code is used).
- The camera on an observation adds photos of it; they print with "Observation n (code)" under them. Photos… at the top adds general photos. See Photos on certificates.
The next inspection
Next Inspection… at the top (or File ▸ Next Inspection from This Job ▸ Next EICR…) starts the next EICR as a new job: same client, installation, boards, circuits and RCDs, with test results, observations, the schedule of inspections, dates and signatures cleared. This report's number and date become the previous certificate number and date of last inspection. The old job is left as it is.
Schedule of inspections
Choose EICR (condition report) or EIC (new work) at the top of the tab.
- EIC: the model form's 14 headings (intake equipment, ADS, basic protection … prosumer's installations), each ✓, N/A or LIM. Set Unrecorded to ✓ / N/A fills the rest. Printed on the EIC's supply and particulars page.
- EICR: the A4 model form for domestic and similar premises, items 1.1 to 8.1 (including 4.23 for AFDDs). Outcomes: ✓, C1, C2, C3, FI, N/V, LIM, N/A, and X in section 1.
- The bubble on each item adds a Location (e.g. DB1, circuit 4) and a comment. Each section ends with a line for anything not covered by its items, and 9.0 covers anything outside the schedule.
- Fill menu: set unrecorded items to ✓ or N/A, apply My Typical Outcomes, take codes from the observations, save the current routine outcomes as your typical set, or clear everything.
- A warning shows any C1, C2, C3 or FI item that isn't in the observations.
Additional bonding information
At the bottom of Details & supply: size (mm²), reading (Ω), location and notes for the water, gas, oil, structural steel, lightning protection and other bonds. Printed on its own page when anything is entered.
Copy Design to EIC
Certificates ▸ Copy Design to EIC (or Analysis ▸ Standard) fills the EIC from the design — work description, designer, means of earthing, main switch — and adds a test result row for every circuit, so only the readings are left to enter.
The PDF
- A4 landscape: a cover page, the details page (EICR: client and reason, installation details, extent and limitations table, standard limitations wording, summary and declaration with both signatures; EIC: client, work and declarations), supply and particulars, then the schedule of inspections (EICR), each board's schedule of circuit details and test results, and the observations and recommendations (EICR) with code counters.
- Long lists carry on to extra pages: boards over 15 circuits, many observations. Long text is cut with “continued on page…” and printed in full on an Additional information page.
- Each board's schedule lists its RCDs under the header and shows which RCD protects each circuit. The additional bonding page follows the schedules when bonding details are entered.
- The last page is guidance for recipients — what the certificate or report means, what C1, C2, C3 and FI mean (EICR), keeping it safe, and testing RCDs, AFDDs and SPDs — with the codes for type of wiring (A–H, O, plus FP, TR, HT, SY, YY, CY and VIR).
- EIC PDF… / EICR PDF… or Email… at the top, or the Certificates menu. Save windows open in your default folder.
Tip. Check every certificate against the current IET model forms before issuing it. You are responsible for what you sign.
Certificate Settings
Certificates ▸ Certificate Settings, or the gear button on the Certificates screen. Shared by every job.
- Test instruments
- Add each multifunction tester with its serial number, calibration date and interval. The first in the list fills new certificates; pick another from the drop-down on a certificate. A banner and a notification remind you a month and a week before calibration is due.
- Signatures
- Save each person's name, position and signature once; choose them on a certificate with Signatory.
- Max Zs
- Print maximum Zs at 80 % (the rule of thumb for readings taken cold) or 100 % of the BS 7671 table value.
- Ring continuity
- Show or hide the r1 / rn / r2 boxes for those who don't record them.
- Default test voltage
- Insulation resistance test voltage for new rows (normally 500 V).
- Fill people from my details
- New certificates get your name and company in the people sections.
- Default texts
- Extent, agreed limitations (one per line — your usual ones are filled in to start) and departures put on new certificates.
- Typical inspection outcomes
- Saved from the schedule of inspections Fill menu.
- Numbering
- Prefix, next number, digits and type suffix (EICR, MW, EV, PV, PAT, FA) for Next number.
- PDF appearance
- The colour of headings and title bars on the certificates.
PAT testing
Add a PAT Certificate to the job with Certificate: and Add on the Certificates screen, or start a job with File ▸ New Certificate ▸ PAT Certificate. Testing follows the IET Code of Practice for In-service Inspection and Testing of Electrical Equipment.
Details
- Certificate number, date of testing and the re-test period (the recommended re-test date is worked out).
- Client and Premises with Edit…, Copy from Client and Search…; description of premises.
- Extent, limitations (one per line), who they were agreed with, and comments.
- Tested by and authorised by, with signatures, and the PAT tester (from your instruments) and microwave leakage detector.
Appliances
- Add Appliance (⇧⌘N) adds the next number, carrying over the location and re-test period. The copy button duplicates an item (not its readings).
- Fill in across: number, description, location, class (Class I, Class II, IEC lead, extension lead, Class III), visual, earth continuity, insulation resistance, leakage, polarity, functional check, fuse and re-test period.
- The result is worked out from the readings: earth continuity up to 0.1 Ω plus the flex resistance (2 m of 0.75 mm² assumed unless you enter the flex), insulation at least 1 MΩ Class I or 2 MΩ Class II, leakage up to 0.75 mA (Class I portable), 3.5 mA (stationary or IT) or 0.25 mA (Class II), plus a fuse too small for the rating. Readings outside the limits show in red.
- The pencil opens every detail: make, model, serial, type of use, rating (with the suggested fuse), flex, test voltage, load, microwave leakage, test date, the findings, and Result — set PASS or FAIL yourself if your judgement differs. Failed items get a reason and recommendation.
Importing from your PAT tester
- Export the results from your tester or its software (Seaward, Megger, Kewtech, Metrel and others) as a CSV or tab-separated text file, then click Import from Tester… under the register.
- VoltPlan matches each column by its heading — asset number, description, location, class, earth, insulation, leakage, polarity, functional, fuse, rating, result, test date, next test date or re-test interval, notes. Check the matches against the first values shown, change any that are wrong, or set a column to Don't import.
- Update appliances already on the register with the same asset number fills in readings for items you've already listed (their photos and other details are kept); everything else is added.
- Readings like > 299 MΩ or OL are understood. The result is worked out from the readings as usual. Where the tester's PASS/FAIL disagrees, VoltPlan's result is kept and a note is added to the item so you can check it; the tester's result is used only where the file has no readings.
- Dates not in the file use the certificate's test date, and the re-test period uses the certificate's.
Next year's test
Next Inspection… at the top (or File ▸ Next Inspection from This Job ▸ Next PAT Test…) makes a new job with the same client, premises and appliance register, with every reading, result, test date and signature cleared — ready to go round again. The old job is left as it is.
Asset labels
- Asset Labels… makes a PDF of labels on standard A4 sheets: 65, 40, 24, 21 or 14 to a sheet (Avery L7651, L7654, L7159, L7160, L7163 or compatible).
- Each label shows PASSED in green (or FAILED — DO NOT USE in red), the asset number and description, the test date, the re-test date, who tested it and, if you like, your company name and phone. The smallest labels keep just the essentials.
- Choose every tested appliance, passed only or failed only, up to three copies of each, and Start at label to finish off a part-used sheet (counted across, then down).
- Print at Actual size (100%). Tick Print label outlines and try the first sheet on plain paper held against a label sheet to check it lines up.
Photos
Photos… at the top adds photos to the certificate; the camera on an appliance's row adds them to that appliance. See Photos on certificates.
The PDF
PDF… gives the details page (client, premises, summary of tested/passed/failed, limitations, comments, instruments and declaration), the appliance register (18 items a page), a failures page when anything failed, any photographs, and guidance for the person receiving it.
Tip. Codes of practice suggest re-test intervals by type of equipment and environment — set each item's period to suit.
Client list
Clients you save are available on every certificate and job, so you only type them once.
- Add Client… (EIC / EICR details): name, address, email and phone; tick Installation is at a different address for a landlord or agent and add the property address and occupier. The client is saved and put on the certificate.
- Search… / Search Clients…: search by name, address, phone or email and double-click (or Use Client). Right-click a client to Edit… or Delete….
- Edit… on any client keeps Save to my client list ticked by default, updating the saved client with the same name and address.
- Deleting a client from the list doesn't change certificates already made.
- Installation addresses (a landlord's properties, say) are kept in the Address book too: Choose… beside an installation address picks one. See Address book.
Tip. The list is saved on this Mac with your other VoltPlan settings. Back it up with Settings ▸ Files ▸ Back Up Settings… (or File ▸ Back Up Settings & Clients…).
Certificates in a job
A job can hold one of each certificate: EICR, EIC, Minor Works, EV charger, Solar PV, fire alarm and PAT. They're listed under Certificates in the sidebar.
Adding a certificate
- Open Certificates in the sidebar.
- At the top, choose the type next to Certificate:.
- Click Add. The certificate opens and appears in the sidebar, for example “EICR – Mrs J Smith” once the client is filled in.
- If the job already has one of that type, it's opened instead. For another one, start a new job with File ▸ New Certificate.
- Click a certificate in the sidebar to open it. A green tick shows it's complete.
- The EIC and EICR share their details, circuits and test results, so adding both to one job doesn't mean typing them twice.
Complete
- Along the bottom of every certificate is a bar with Complete and Delete Cert… (an EICR also shows its overall assessment there).
- Complete checks the certificate. Anything missing or wrong — no number, client or address, unsigned declarations, circuits without results, readings outside the limits and so on — is listed in the bar and marked in red on the certificate. Put each one right; the list updates as you go.
- When nothing is missing, the certificate is marked complete (a green tick in the sidebar and beside its name). Reopen marks it not complete again.
Delete Cert
- Delete Cert… in the bar (or right-click the certificate in the sidebar) takes the certificate out of the job, after asking. Its details, results, signatures and photos go; the design's boards and circuits are not affected.
- Deleting an EIC or EICR when the job has the other keeps the shared details and test results for that one.
- Edit ▸ Undo brings a deleted certificate back.
Tip. Complete is a check, not issuing. A certificate is issued (and counted) the first time it's exported as a PDF, emailed or printed.
Address book
The address book holds two lists, shared by every job: client addresses (your client list) and installation addresses — the places you work on, such as a landlord's or agent's properties. Pick from them on any certificate instead of typing addresses again.
Adding addresses
- Edit ▸ Add Address…: choose Client or Installation at the top, then fill in the address (building and street), town / city and postcode. A client also has a name, phone, email and occupier; either can have notes.
- New Address… in the Choose… menu beside an installation address adds one and puts it on the certificate.
- Add Client… and Edit… on a certificate's client save to the client list. See Client list.
Picking an installation address
Choose… beside the installation address on a certificate offers Same as the client's address, your saved installation addresses, the addresses of your clients, New Address… and Address Book….
Edit ▸ Address Book…
- Switch between Client addresses and Installation addresses at the top; each shows how many there are.
- Search by name, address or postcode. Add Address… adds one; right-click an entry to Edit… or Delete….
- Changing or deleting a saved address doesn't change certificates already made.
Tip. Back up the address book with your other settings: File ▸ Back Up Settings & Clients….
Fire alarm certificate
For domestic fire detection and fire alarm systems to BS 5839-6, Grades D1, D2, F1 and F2 — laid out after the model certificate. Add a Fire Alarm Certificate to the job on the Certificates screen, or start a job with File ▸ New Certificate ▸ Fire Alarm.
Certificate and premises
- Certificate number (Next number adds the FA suffix if you've chosen type suffixes), date, and the client with Edit… and your client list.
- Premises protected: the installation address (Choose… picks a saved address or the client's) and the occupier.
System grade and category
- Grade: D1 (mains with tamper-proof standby), D2 (mains with replaceable standby), F1 (battery, tamper-proof) or F2 (battery, replaceable).
- Category (life) LD1, LD2 or LD3, and Category (property) None, PD1 or PD2.
- Areas protected: the rooms and circulation spaces covered — needed for LD2 and PD2.
Schedule of installed devices
- Add alarm for each smoke, heat and CO alarm fitted, room by room. A new alarm copies the last one's type, make, model, replace-by date and interlink.
- For each: location, type (optical smoke, heat, multi-sensor, CO and the combined types), interlink (hardwired, radio, both or none), manufacturer, model, replace by date as printed on the alarm, and Tested or Failed.
- Duplicate copies an alarm below itself; the bin removes it.
Inspection, testing and commissioning
- Answer each check Yes or No: siting, mains supply and isolation (Grade D only), batteries, every alarm tested, one alarm sounds them all, and audible in every bedroom with the doors closed.
- Optionally record the sound level in dB(A) and where it was measured.
- For mains alarms, record the EIC or Minor Works certificate number for any new wiring — that wiring needs its own BS 7671 certificate.
Variations, instructions and declaration
- Variations from BS 5839-6 (left blank, “None” is printed).
- Whether written user instructions were handed over, and to whom.
- Declaration covers: tick Design, Installation and/or Commissioning — the declaration is worded to match. Then Signed by, with your saved signature or Sign Now….
Before it goes out
Complete, exporting or emailing checks for no alarms, alarms with no location, areas protected missing for LD2 / PD2, nothing ticked under Declaration covers and, when you're signing for commissioning, unanswered or failed checks and instructions not handed over.
The PDF
Page one has the client, premises and contractor, grade and category, and the schedule of alarms; page two the commissioning checks, variations, user instructions and declaration. Photos follow on Photographs pages. PDF…, Email… and Print… at the top, or the Certificates menu.
Tip. The wording is a paraphrase, not the BSI model text. Check it against your copy of BS 5839-6 and your scheme's form before issuing.
Minor Works, EV charger and Solar PV
Add the certificate to the job with Certificate: and Add at the top of the Certificates screen, or start a job with File ▸ New Certificate. It's then listed under Certificates in the sidebar. See Certificates in a job.
Minor Electrical Installation Works certificate
- For an addition or alteration that doesn't add a new circuit, or a single new circuit.
- Client and Installation: Edit… opens name, address, phone, mobile and email; Copy from Client fills the installation from the client; Search… picks a saved client.
- Description of the work, date, system type, Ze / Zdb, PFC at the board, method of protection, comments on the existing installation, departures and the RCD risk assessment.
- Essential checks (SPD, wiring type, reference method, earthing conductor, bonding) as ✓ / N/A, the circuit's details, test results and the instruments used.
- Pick the circuit from the design with Circuit to fill in its board, device and cable details.
EV charger installation certificate
- Laid out like the IET Code of Practice (5th edition) Appendix B dwelling certificate.
- Client and Installation with Edit…, Copy from Client and Search…; associated EIC number, DNO reference, supply taken from, details of the work and equipment location.
- Risk assessment form B1 (steps 1–5, Yes / No / N/A), essential precautions and whether the customer was told in writing.
- Charger make, model, serial number, charging mode, ratings and settings; earthing (PME with an open-PEN device, TT electrode…); protective device, RCD type, trip times at IΔn and 5 IΔn and the ramp test.
- The checklist (before, during and after installation) with Code of Practice references. Mark each item ✓, ✗ or N/A. The engineer and reviewer sign.
Solar PV installation certificate
- Client and Installation with Edit…, Copy from Client and Search…, the same as the EV certificate.
- Fill from Solar PV design copies the array, inverter and string details from Solar PV & battery.
- Record each string's open-circuit voltage, short-circuit current and insulation resistance. VoltPlan compares them with the expected values and flags readings out of range.
- DNO notification: G98 (up to 16 A per phase) or G99, DNO notified and the DNO reference.
People and signatures
- Designer, installer and inspector each have a name, position, company and date.
- Fill from my details copies your details from Settings ▸ Company.
- Sign Now… opens a pad: sign with the mouse or trackpad and click Use Signature. Use My Saved Signature puts in the one saved in Settings. The signature appears on the PDF.
Exporting and emailing
- Photos… adds photos, printed on Photographs pages near the back of the PDF. See Photos on certificates.
- Print… (or File ▸ Print, ⌘P) prints the certificate straight away. Exporting, emailing or printing a certificate the first time issues it — see Buying VoltPlan.
- Before it goes out, VoltPlan lists anything missing or wrong — no certificate number, client or address, declarations not signed, circuits with no test results, readings outside the limits, an EICR marked satisfactory with C1/C2/FI observations, no company details. Go Back to put it right, or Continue Anyway.
- PDF… saves the certificate as a PDF. The Minor Works and EV certificates end with a page of guidance for the person receiving them.
- Email… opens Mail with the PDF attached, addressed to the Client email, with a subject and short message ready to edit. The Email section in Settings ▸ Company sets the message.
- Or use Certificates ▸ Export and Certificates ▸ Email Certificate in the menu bar.
Tip. Check every certificate against the current IET model forms before issuing it. You are responsible for what you sign.
Photos on certificates
Every certificate — EIC / EICR, Minor Works, EV charger, Solar PV, fire alarm and PAT — can carry photos: a missing bond, the condition of the consumer unit, the charger as installed, a damaged appliance. They're printed four to a page on Photographs pages near the back of the PDF, each with its number and caption.
Adding photos
- Click Photos… at the top of the certificate (it shows how many there are).
- Add Photos… (⌘O) picks pictures from your Mac; or drag them in from Finder or the Photos app; or copy a picture and click Paste. JPEG, PNG and iPhone HEIC photos all work.
- On an EICR observation or a PAT appliance, the camera button adds photos linked to that item and shows how many it has.
Each photo
- Caption: what it shows. Picture file names from a camera (IMG_1234…) aren't used as captions.
- Shows: link it to an observation (EIC / EICR) or an appliance (PAT) — the PDF prints "Observation 3 (C2)" or the appliance's number under the photo. Links to items you delete go back to General.
- On PDF: untick to keep a photo in the job without printing it.
- The arrows change the order (the photo numbers follow it); the red button deletes it (Edit ▸ Undo brings it back). Click a picture to see it larger.
- Photos are kept inside the job file, scaled down to 1600 pixels so files stay a sensible size; the window shows how much they add.
- The EIC and EICR share their photos. Photos linked to observations are left off the EIC, because the EIC doesn't print observations.
Costing and materials list
The materials list (⌘0) is built from the design:
- Cables from measured plan routes (with wastage and strappers) or typed lengths.
- Protective devices: one per circuit.
- Enclosures: boards sized for their circuits + 25 % spare ways.
- Wiring accessories from the plan.
Columns
- Unit price
- Grey = from a price list. Type a price to override it for this project.
- Supplier
- Which supplier's price is used. Default follows Settings; or pick any supplier that has the item (each shown with its price).
- Price list item
- The product code and description used. Type a product code to pin that exact line.
- Total
- Quantity × unit price.
Totals
- Mark-up on materials (%) and Labour rate (£/h) are added below the table, with the total.
- “Items have no price” shows how many lines still need one.
Buttons
Import prices…, Export price sheet…, Export materials list…, plus Price source… and Check now for supplier price lists.
Supplier price lists
Prices come from your wholesalers' price files, shared by every project. Set them up in VoltPlan ▸ Settings ▸ Prices (or Price source… on the Costing screen).
Tip. VoltPlan doesn't include any prices and can't make them up: trade prices belong to each wholesaler and depend on your account with them. You may need to open a trade account first, then ask the wholesaler (your branch or account manager) for your price list as a CSV file or a download link. Until a price list is added, only prices you type into a project are used. The ⓘ next to Costing & materials in the sidebar explains this and opens this page.
Adding a supplier
- Click Add supplier.
- Type the supplier's name or pick it from Choose.
- Choose where the prices come from:
- Web link: paste the download link and click Save & Check. Google Sheets, Google Drive and Dropbox share links are converted automatically.
- Folder: choose the folder the supplier's emailed price files are saved into; the newest file is used.
- File imported by hand: Import File… to load a CSV from your Mac.
- The status line shows how many lines were read and how many of your items matched.
Choosing prices
- Use prices from
- The cheapest supplier for each item, or one supplier for everything.
- Check for new prices each time VoltPlan opens
- Re-reads every supplier at launch if the file has changed.
- Price lists replace prices typed into a project
- Off (the usual setting): if you type a price into a project, that price is used instead of the price list's. On: the price list's price is always used, even where you've typed one.
- Add breakers in the price lists to the equipment library
- Matched MCBs, RCBOs and MCCBs become library entries.
- Each supplier has a switch to stop using it (its prices are kept), Check, and a bin to remove it.
- Check All Now (or Costing ▸ Check for Price Updates, ⌥⌘U) re-reads every supplier.
Searching the price list
The table at the bottom shows every line from every supplier. Search by code, description, supplier or item (e.g. “rcbo b32”), or tick Matched lines only.
How matching works
VoltPlan reads each description for phrases such as “6242Y 2.5mm” or “twin and earth”, “RCBO B32 6kA”, “consumer unit 10 way” and “2 gang socket”. Drum prices are turned into per-metre prices. Where a match is wrong or missing, pin the product code on the Costing screen.
Tip. The file must be your electrical wholesaler's trade price file (CSV or tab-delimited). A general goods list won't match.
My prices
Your own price list: what you actually pay for each cable, device, accessory and enclosure. Open it with Costing ▸ My Prices… or the My prices… button on the Costing screen (it shows how many you've priced).
Which price is used
- A price typed on the job itself (on the materials list).
- Otherwise My prices.
- Otherwise your suppliers' price lists, shown in grey in the My prices window.
Using the window
- Choose a category at the top (each shows how many you've priced), or search every item — for example “2.5 mm”, “RCBO B32” or “double socket”.
- Type your price in an item's box; leave it empty to use your suppliers' price. Only the ones I've priced hides the rest.
- Export for Excel (CSV)… saves the whole list with your prices, to fill in with a spreadsheet; Import CSV… reads it back. Clear All… removes your prices (after asking).
Tip. My prices are shared by every job and kept with your other settings, so File ▸ Back Up Settings & Clients… includes them.
Equipment library
Settings ▸ Equipment lists the protective devices you can choose from From equipment library in a circuit.
- Generic devices are built in. Add your own with Import CSV…; Export template / library… gives a template to fill in.
- Breakers matched in your price lists are added automatically (manufacturer, part number, curve, rating, kA, price, supplier).
- Remove imported items clears what you've imported.
Tip. Let-through I²t stays at the class 3 limit until you add the manufacturer's data.
Making the costing accurate
The materials list and total are a starting estimate built from the design. They're only as good as what's been drawn and priced. The orange This is an estimate, not a quote strip at the top of Costing & materials says so, and its ⓘ (also beside the heading and the total) gives the short version; Why, and how to fix it… opens this page. The ⓘ next to Costing & materials in the sidebar explains where prices come from (see Supplier price lists). Work through these to tighten them up:
Quantities
- Draw cable routes on the floor plan. Measured routes (with the drop past each box and wastage) are far closer than the length typed on a circuit. See Cable routes and lengths.
- Place every accessory on the plan: sockets, switches, lights, spurs, isolators. Only placed items are counted.
- Check each circuit's length if you're not using the plan: it's used as-is for the cable quantity.
- Add the sundries yourself: clips, back boxes, glands, grommets, conduit, trunking, labels and fixings aren't calculated. Add them as extra lines in your quote, or allow for them in the mark-up.
Prices
- Set up your wholesaler's price list in VoltPlan ▸ Settings ▸ Prices (or Price source… on the Costing screen). Without one, only prices typed into the project are used. See Supplier price lists.
- Check “items have no price”: those lines aren't in the total. Type a price, or pin a product code in the Price list item column.
- Look over the matched lines: matching is by description, so pin the exact product code for anything that's picked the wrong item.
- Press Check now before quoting so the latest supplier prices are used.
Labour and mark-up
- Labour is a rough allowance per item (cable runs, devices, accessories, boards) at your labour rate. Adjust the rate and add time for anything unusual: access, lifting floors, making good, testing and certification.
- Set your mark-up on materials to cover sundries, wastage and price changes.
Tip. Treat the total as a guide for your quote, not the quote itself. Always sense-check it against your experience of similar jobs.
Settings and reference
Your company, logo and signature
The first time you open Certificates without company details, VoltPlan offers to take you here. Choose VoltPlan ▸ Company Details…, or VoltPlan ▸ Settings… (⌘,) — Settings opens on the Company tab. (Buttons elsewhere open the tab they're about: Price source… on the Costing screen opens Prices.)
- Business: company name, address, phone, email, website and Registration / scheme no. (for example your NICEIC or NAPIT number).
- Logo: click Choose… and pick a PNG or JPEG. It is printed at the top of every certificate.
- You: your name, position and registration number, used by Fill from my details.
- Signature: sign once here; Use My Saved Signature on a certificate puts it in.
- These details are saved on this Mac and shared by every project.
Settings
VoltPlan ▸ Settings (⌘,) opens on the Company tab; click the tabs at the top for the others. VoltPlan ▸ Company Details… goes straight to Company, and Price source… on the Costing screen (or Costing ▸ Price Source Settings…) straight to Prices.
- Company
- Your business details, logo, your own details and signature, and the email message for certificates.
- Files
- The default folder for new jobs and for every save and export window (Documents ▸ VoltPlan to start with; Choose…, Show in Finder), Save changes automatically, and Back Up Settings… / Restore from Backup… — copies your company details, logo and signature, certificate settings and instruments, client list, supplier price lists and equipment library to a folder (for a new Mac, a second Mac, or safe keeping). After restoring, quit and reopen VoltPlan.
- Prices
- Supplier price lists. See Supplier price lists.
- Purchases
- What you've bought, free and included certificates left, Restore Purchases and Manage Subscriptions. See Buying VoltPlan.
- Equipment
- The equipment library.
- Add-ons
- Switch on arc flash, UK certification forms, CAD plan design and BIM exchange.
Certificate options (instruments, signatures, Max Zs, numbering…) are in Certificates ▸ Certificate Settings.
Keyboard shortcuts
Files and editing
- ⌘N new project · ⌥⌘N new EICR · ⌘O open · ⌘S save · ⇧⌘S save as · ⌘P print · ⇧⌘W close job · ⌘W closes the window in front
- ⌘Z undo · ⇧⌘Z redo — Edit ▸ Undo says what it will undo, e.g. Undo Add Circuit · Delete removes the selected item (circuit, board, or item on the plan)
- ⇧⌘E export PDF report · ⇧⌘I import panel schedule (BIM exchange add-on)
Screens
- ⌘1 Supply & project · ⌘2 Floor plan · ⌘3 Schematic
- ⌘4 Fault levels · ⌘5 Load & diversity · ⌘6 Selectivity · ⌘7 Arc flash · ⌘8 Solar PV · ⌘9 Busbar
- ⌘0 Materials list · ⌥⌘U check for price updates
- ⌘, Settings (opens on Company) · ⌥⌘, Certificate Settings · ⌘? Help
- With no job open, only new, open and the settings shortcuts work.
Certificates
- Return in the schedule of test results or the PAT register moves down to the same box on the next circuit or appliance; on the last appliance it adds the next one. Tab moves across.
- ⇧⌘N add the next appliance (PAT appliance register)
- ⌘Return clicks OK in the boxes for writing long text (observations, inspection comments, descriptions) — plain Return starts a new line — and sends feedback · Return is the highlighted button and Esc cancels in every window
On the floor plan
- Arrow keys: move the selected door or window 50 mm
- R turn the selected door · H swap its hinge · F open in / out
- Pinch on the trackpad to zoom
Before trusting any result
- Cable data: current-carrying capacities and voltage drops are from BS 7671:2018+A4:2026 Appendix 4 (Tables 4D1A/B, 4D5, 4E4A/B), with Tables 4C1 grouping, the 523.9 thermal insulation factors, and Tables 41.2–41.4 maximum Zs, all checked against the published A4 tables.
- Fuses: maximum Zs from Tables 41.2 and 41.4; between those points the fuse curve is approximated. SWA armour as the CPC uses typical armour data (a spare core is assumed by default, which is conservative).
- Busbar, PV cable and class 3 I²t values are generic: use manufacturers' figures.
- Arc flash uses the IEEE 1584-2002 LV equations.
- Equipment: generic devices plus whatever you import.
- Always check designs and results with your own professional judgement.
Troubleshooting
A room or item doesn't move smoothly
Make sure you're on Select / move. Grab rooms near the middle; corners resize.
I can't see “Wire new items on”
Widen the window or hide the side panel with the Panel button so the whole tool bar fits.
Routes start at a socket, not the board
Place a Consumer unit / DB symbol on the plan and link it to the board.
Two heavy cables leave a switch
The other lights aren't switched by it, so they sit on the circuit cable. Tick them under Also switches.
A switch has no “Fed from”, or it's the wrong one on a 2-way
Set Fed from on the switch you want the circuit cable to reach.
A new switch became an intermediate
Its Controls light was set to a light that already had switches. Set it to another light, or to Nearest light (auto).
Double-clicking a .voltplan file doesn't open VoltPlan
Run VoltPlan once after installing or updating it so the Finder learns the file type. You can always use File ▸ Open Project….
Is there a newer version?
VoltPlan checks the App Store once a day when it opens and tells you when an update is available (View in App Store, Later or Skip This Version). Check now with VoltPlan ▸ Check for Updates….
I can't find where a job was saved
Click Jobs ▸ Show in Finder. New jobs go in the default folder set in Settings ▸ Files.
Prices don't match
Check the price file is your electrical wholesaler's trade list. Pin product codes on the Costing screen for anything still unmatched.
Lights in the list have unexpected numbers
Numbers count within each room in wiring order. Change the order under Cable routes ▸ Wiring order.
Settings goes off the screen
It sizes itself to your screen. If it still doesn't fit, make sure you're on the latest build.
Import and export
Importing
File ▸ Import:
- Panel Schedule from Revit / MagiCAD… (⇧⌘I)
- CSV or tab-delimited. Boards are matched by reference; circuits are added or updated.
- Wholesaler Price List…
- Adds a supplier from a file. See Supplier price lists.
- Project Price Sheet (CSV)…
- Prices for this project only.
- Equipment Library (CSV)…
- Your own devices.
Exporting
File ▸ Export:
- PDF Calculation Report… (⇧⌘E)
- A4 report: supply, fault and demand summary, schematic, circuit schedule, floor plan, cable schedule, and a page per circuit.
- Schematic as DXF… / Floor Plan as DXF…
- DXF R12 for AutoCAD (save as DWG from there).
- Circuit Schedule / Limitations & Deviations / Materials List / Price Sheet (CSV)…
- For Excel.
- Equipment Library (CSV)…
- Your library.
- BIM Exchange for Revit / MagiCAD (JSON)…
- For a Revit or MagiCAD add-in.
- EIC / EICR (PDF)…
- The certificates.
No guides match that search. Try a shorter word, like "EICR" or "ring", or get in touch.
Contact us
Questions about VoltPlan, faults, ideas, or using it in a college. You'll get a reply.
From inside VoltPlan
Help ▸ Send Feedback. It can include your VoltPlan and system version, which helps with faults.
Email
support@voltplan.co.uk
Where we are
Preston, Lancashire, UK
Privacy and terms
Covers VoltPlan and VoltPlan Certificates. Last updated: [date of publishing]
Privacy: the short version
- Your jobs, client details, certificates, photos and signatures stay on your own computers, in files you control, on Mac or Windows. I can't see them.
- The only information that comes to me is what you choose to send through Send Feedback, and the account details needed to check your licence.
- VoltPlan has no adverts, no analytics and no tracking, and I don't sell or share your information.
Information that stays on your computer
VoltPlan saves your work as files on your Mac or Windows PC: designs, certificates, test results, observations, photos and signatures. It also keeps your company details, logo, saved signatures, client list, price lists and settings in its own folder on your computer. None of this is sent to me. If you keep your jobs in a cloud folder such as iCloud Drive, OneDrive, Dropbox or Google Drive, that service stores them under its own privacy terms.
When you email a certificate, VoltPlan opens your own email app with the PDF attached. The email is sent by you, through your email provider. You are responsible for the personal information about your clients that you keep in VoltPlan, in the same way as for paper records.
Information you send me
If you use Help ▸ Send Feedback, VoltPlan sends your name (optional), your email address and your message, and, if you leave the box ticked, the VoltPlan and operating system version numbers. It's sent through Formspree, a form service based in the United States, which passes it to my inbox. I use it only to reply to you and to fix faults and improve VoltPlan, and delete feedback emails once they're dealt with.
Your VoltPlan account and licence
One purchase covers VoltPlan on Mac and Windows. To make that work, a purchase is linked to a VoltPlan account, which uses your email address and a sign-in link, with no password.
- What's kept: your email address, which VoltPlan products and subscriptions you own, your licence key, and which computers it's activated on.
- Activating on Windows: VoltPlan sends your licence key and an identifier for the PC, so a licence can be used on a set number of computers. It doesn't send your name, files or anything about your jobs.
- Purchases made on a Mac: when you sign in, VoltPlan sends the App Store's record of your purchase so it can be checked with Apple and added to your account.
- Why: only to confirm what you've bought, let you move a licence to a new computer, and help if something goes wrong. Account details are kept while your account is open, and deleted when you ask me to close it.
Payments
- On a Mac: purchases and subscriptions are made through the App Store and handled by Apple.
- On Windows: purchases and subscriptions are handled by [payment provider, e.g. Paddle], which acts as the seller and processes your payment under its own privacy policy.
Either way, I never receive your card or bank details. I'm told your name or email address and what you bought, so your licence can be issued.
Connections VoltPlan makes
- Update check: VoltPlan checks whether a newer version is available, through the App Store on a Mac and [update service] on Windows. Only the app's identifier and version are sent.
- Licence check: VoltPlan checks your licence with the VoltPlan licence server from time to time, as described above.
- Price lists: if you add a supplier's price list by web link, VoltPlan downloads the file from that address. Nothing about you or your jobs is uploaded.
Your rights
Under UK data protection law you can ask for a copy of the information I hold about you, ask me to correct or delete it, or object to how it's used. Email support@voltplan.co.uk. If you're unhappy with how I've handled your information, you can complain to the Information Commissioner's Office (ico.org.uk).
Terms of use
VoltPlan helps you design and record your work. It doesn't replace your own judgement: check every design and certificate before you rely on it or issue it. Certificates are laid out after the IET model forms.
A licence is for your own use, on up to [2] computers at a time. You can move it to a new computer by deactivating the old one.
Subscriptions
Subscriptions renew automatically at the end of each month or year until you cancel. Cancelling stops the next renewal; you keep access until the end of the period you've paid for. Certificates you've already issued always stay yours to open and export.
- On a Mac: payment is charged to your Apple Account. Cancel at least 24 hours before the end of the period, in your App Store account settings.
- On Windows: payment is taken by [payment provider]. Cancel from [where: the link in your receipt email, or your VoltPlan account].
Contact
Eric Brooks, support@voltplan.co.uk